City of Tampa • FL • opengov

Waste to Energy (WTE) Facility Lagging/Insulation Service

Posted Jan 16, 2026Closes Feb 18, 2026Status: currentInvitation to Bid

View original posting

Submit your bid directly on the source platform.

Go to source

Summary

Provide Lagging/Insulation Services for the McKay Bay Waste to Energy (WTE) Facility located at 107 North 34th Street, Tampa, FL 33605. In addition, Contractor may be asked to perform miscellaneous repairs agreed upon by the City representative and Contractor.

Full description

Historically, based on annual tonnage of Municipal Solid Waste (MSW) received at the City of Tampa McKay Bay (WTE) Facility, the Facility conducts eight (8) scheduled maintenance-related outages per calendar year, of which one will be a Cold Iron outage. A routine scheduled outage is normally a period of 7 days when the boiler is taken off-line Saturday for operational cleaning to get the boiler ready for the contractors starting on Monday morning at 7 am.

Attachments

Contact

Email:
bobby.baker@tampagov.net
Phone:
(813)781-5508
Title:
WTE Maintenance Supervisor
Address:
[object Object]

Addenda

Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.

Waste to Energy (WTE) Facility Lagging/Insulation Service | SignalTender