Regional Transportation District • CO • opengov

Purchase of Materials for the Walnut Crossing Rail Reconstruction

Posted Jan 13, 2026Closes Feb 17, 2026Status: currentInvitation for Bid

View original posting

Submit your bid directly on the source platform.

Go to source

Summary

The Regional Transportation District will be replacing a section of double track crossing Walnut Street between the Auraria West Station and the Empower Field at Mile High Station in downtown Denver. The project includes the replacement of two curves consisting of pre-curved rail with restraining rail and tie assemblies.Provide a bid for all pre-curved rail, restraining rail and tie assemblies required to complete the construction of these projects. The bid shall be for track materials only.The base bid shall include:Pre-curved running and restraining rail for Curves NB05, and SB05 (including spirals)196 EA – Restraining Rail Tie Assemblies24 EA – Transition Ties Assemblies2 EA – Insulated Joint Kit – Single Rail2 EA – Insulated Joint Kit – Double RailThis solicitation is for track materials only.

Full description

The Regional Transportation District will be replacing a section of double track crossing Walnut Street between the Auraria West Station and the Empower Field at Mile High Station in downtown Denver. The project includes the replacement of two curves consisting of pre-curved rail with restraining rail and tie assemblies.Provide a bid for all pre-curved rail, restraining rail and tie assemblies required to complete the construction of these projects. The bid shall be for track materials only.The base bid shall include:Pre-curved running and restraining rail for Curves NB05, and SB05 (including spirals)196 EA – Restraining Rail Tie Assemblies24 EA – Transition Ties Assemblies2 EA – Insulated Joint Kit – Single Rail2 EA – Insulated Joint Kit – Double RailThis solicitation is for track materials only.

Attachments

Contact

Email:
erik.haugen@rtd-denver.com
Phone:
(303)299-2237
Title:
Senior Engineer
Address:
[object Object]

Addenda

Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.

Purchase of Materials for the Walnut Crossing Rail Reconstruction | SignalTender