REPLACEMENT OF IN-SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST

Posted Feb 9, 2026Closes Mar 2, 2026Status: currentInvitation to Bid; Engineering

View original posting

Submit your bid directly on the source platform.

Go to source

Summary

NOTICE IS HEREBY GIVEN that the Town of Manchester, Connecticut, herein called the Town, acting by and through its Town Manager will receive sealed Bids for project Bid No. 25/26-35 REPLACEMENT OF IN-SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST. Bids will be accepted via the Town's eProcurement Portal until 2:00 pm on Monday, March 2, 2026 at which time and place said bids will be publicly opened and read aloud.Bids may be submitted prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered.

Full description

Work under this contract includes the replacement of approximately thirty (30) existing in-service 16-inch butterfly valves and fifty (50) gate valves, varying in size from 4-inches to 12-inches, with new resilient wedge gate valves located along the Town-owned section of Main Street (trailblazed as Route 83) primarily in the Downtown section of the Town of Manchester between Hartford Road and US Route 6/44 (Center Street). Included with the primary work in the Downtown area, there are three additional spot locations with valve replacements within the CT Dept. of Transportation-owned Route 83 (S Main St) right of way used to isolate the water main carried by the S Main St bridge over I-384 (valves are located beyond bridge limits/outside I-384 right of way). The project's valves identified have either failed or are at the end of service life and need to be replaced as part of system maintenance.Work includes other appurtenant work such as installation of resilient wedge gate valves at new locations, replacement of existing water main segments with ductile iron pipe ranging in size from 4-inches to 16-inches as part of reconnecting the replacement valve installations, temporary and permanent pavement repair, and traffic control. The Work may include the installation of various size insertion valves and line-stops to facilitate gate valve installations.The Project Schedule for this project is projected to be completed within ONE HUNDRED FIFTY (150) WORKING DAYS (contract days).

Attachments

Contact

Email:
jdibiasi@manchesterct.gov
Phone:
(860)647-3154
Title:
Assistant Town Engineer
Address:
[object Object]

Addenda

Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.