The City of Anaheim • CA • opengov
Cerritos Avenue (Walnut St. to Ninth St.) Water Main Replacement
View original posting
Submit your bid directly on the source platform.
Summary
This project involves abandoning the existing 10-inch cast iron water main and upsizing the new main to 12-inch ductile iron pipe. The project also involves the replacement of large domestic water services, 1-inch and 2-inch water services, and fire hydrants, as well as pavement restoration of trenched areas.
Full description
This project involves abandoning the existing 10-inch cast iron water main and upsizing the new main to 12-inch ductile iron pipe. The project also involves the replacement of large domestic water services, 1-inch and 2-inch water services, and fire hydrants, as well as pavement restoration of trenched areas.
Attachments
Contact
- Email:
- jmartin@anaheim.net
- Phone:
- (714)765-5157
- Title:
- Construction Contracts Administrator
- Address:
- [object Object]
Addenda
Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.