The Work under this Project consists of approximately 1,100 LF of 8-inch PVC C-900 Gravity Sewer, including manholes, residential sanitary sewer cleanouts, and connection to the existing gravity sewer manhole near the intersection of McCoy Road and Burson Drive. Approximately 200 LF of 4-inch ductile iron low-pressure force main, including pigging station, residential cleanouts, and connection to the proposed 8-inch gravity sewer as shown on the Contract Drawings. Associated water main relocations, water service relocations, pavement restoration and mill and overlay, as well as restoration as shown on the Contract Drawings shall be completed.

Full description

The Work under this Project consists of approximately 1,100 LF of 8-inch PVC C-900 Gravity Sewer, including manholes, residential sanitary sewer cleanouts, and connection to the existing gravity sewer manhole near the intersection of McCoy Road and Burson Drive. Approximately 200 LF of 4-inch ductile iron low-pressure force main, including pigging station, residential cleanouts, and connection to the proposed 8-inch gravity sewer as shown on the Contract Drawings. Associated water main relocations, water service relocations, pavement restoration and mill and overlay, as well as restoration as shown on the Contract Drawings shall be completed.

Attachments

Contact

Email:
nremus@cityofchesapeake.net
Phone:
(757)382-6360
Title:
Engineer II
Address:
[object Object]

Addenda

Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.

Burson Drive Sewer Extension- Cost Participation Project | SignalTender