City of Clearwater • FL • opengov

Harbor Marina S-N Wave Attenuator Replacement

Posted Dec 10, 2025Closes Feb 26, 2026Status: currentConstruction Bid

View original posting

Submit your bid directly on the source platform.

Go to source

Summary

The scope of this project includes the replacement of 4 floating wave attenuators on the marginal wharf and A-Dock, one finger pier, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators. The wave attenuators will be replaced by 3 13-foot-wide wave attenuators in the orientation presented on the drawings. Due to the alignment and size of floating docks to be removed and anticipated to be replaced with, a small gangway is needed to bridge the gap between the new and existing attenuators on A-Dock. Also, a new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf. The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators. Additionally, the contractor shall replace the transition plates at the south end of A-Dock from the previous attenuator replacement that were damaged during Hurricane Helene, as well as fixing the pile sleeves that were also damaged during the hurricane.

Full description

The scope of this project includes the replacement of 4 floating wave attenuators on the marginal wharf and A-Dock, one finger pier, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators. The wave attenuators will be replaced by 3 13-foot-wide wave attenuators in the orientation presented on the drawings. Due to the alignment and size of floating docks to be removed and anticipated to be replaced with, a small gangway is needed to bridge the gap between the new and existing attenuators on A-Dock. Also, a new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf. The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators. Additionally, the contractor shall replace the transition plates at the south end of A-Dock from the previous attenuator replacement that were damaged during Hurricane Helene, as well as fixing the pile sleeves that were also damaged during the hurricane.

Attachments

Contact

Email:
jennifer.burgett@myclearwater.com
Phone:
(727)444-8207
Title:
Contract and Procurement Specialist
Address:
[object Object]

Addenda

Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.

Harbor Marina S-N Wave Attenuator Replacement | SignalTender