City of Clearwater • FL • opengov

Baycare Ball Park Berm Wall Repair

Posted Jan 21, 2026Closes Feb 25, 2026Status: currentConstruction Bid

View original posting

Submit your bid directly on the source platform.

Go to source

Summary

The work shall consist of providing new structural stability to the existing outfield berm wall in the form of soil nail shotcrete walls along the berm. The shotcrete wall will span the entire height of the berm with a concrete curb 1 ft above the top of soil at the top of wall. The soil nails will be placed at uniform spacing along the extend of the wall.Construction duration 90 calendar days.

Full description

The work shall consist of providing new structural stability to the existing outfield berm wall in the form of soil nail shotcrete walls along the berm. The shotcrete wall will span the entire height of the berm with a concrete curb 1 ft above the top of soil at the top of wall. The soil nails will be placed at uniform spacing along the extend of the wall.Construction duration 90 calendar days.

Attachments

Contact

Email:
jennifer.burgett@myclearwater.com
Phone:
(727)444-8207
Title:
Contract and Procurement Specialist
Address:
[object Object]

Addenda

Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.