City of Clearwater • FL • opengov
Baycare Ball Park Berm Wall Repair
View original posting
Submit your bid directly on the source platform.
Summary
The work shall consist of providing new structural stability to the existing outfield berm wall in the form of soil nail shotcrete walls along the berm. The shotcrete wall will span the entire height of the berm with a concrete curb 1 ft above the top of soil at the top of wall. The soil nails will be placed at uniform spacing along the extend of the wall.Construction duration 90 calendar days.
Full description
The work shall consist of providing new structural stability to the existing outfield berm wall in the form of soil nail shotcrete walls along the berm. The shotcrete wall will span the entire height of the berm with a concrete curb 1 ft above the top of soil at the top of wall. The soil nails will be placed at uniform spacing along the extend of the wall.Construction duration 90 calendar days.
Attachments
- SCRUTINIZED_COMPANIES_AND_BUSINESS_OPERATIONS_CERTIFICATION_(7).pdf
- Baycare_Ball_Park_Berm_Wall_Repair_(Addendum_#4_Revision).pdf
- 2025-10-06_CLWRC25013-Baycare_Ballpark_Berm_Wall_Repair_SS_SIGNED.pdf
- DES_208614-Geotech_Report_CLWRC20008.pdf
- PreBid_Agenda.pdf
- Pre-bid_meeting_sign_in.pdf
- Compliance_with_787.06_form__(4).pdf
- Section_V_-_Contract_Documents.pdf
Contact
- Email:
- jennifer.burgett@myclearwater.com
- Phone:
- (727)444-8207
- Title:
- Contract and Procurement Specialist
- Address:
- [object Object]
Addenda
Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.