City of Seattle • WA • opengov
Hiawatha Play Area Renovation
View original posting
Submit your bid directly on the source platform.
Summary
Project Description: This project relocates and replaces the play area at Hiawatha Playfield. Additives are Accessible Asphalt Paving, Site Furnishings, and Play Equipment; and Alternate is Synthetic Safety Surfacing and We-Go-Round.Engineer's Estimate: $574,916.00, Additive#1: $16,729.00, Additive#2: $15,700.00, Additive#3: $13,077.00, Alternate#4: $118,617.00.Project Location: Hiawatha Playfield- 2700 California Ave NW, Seattle WA 98116
Full description
Project Description: This project relocates and replaces the play area at Hiawatha Playfield. Additives are Accessible Asphalt Paving, Site Furnishings, and Play Equipment; and Alternate is Synthetic Safety Surfacing and We-Go-Round.Engineer's Estimate: $574,916.00, Additive#1: $16,729.00, Additive#2: $15,700.00, Additive#3: $13,077.00, Alternate#4: $118,617.00.Project Location: Hiawatha Playfield- 2700 California Ave NW, Seattle WA 98116
Attachments
Contact
- Email:
- fuadi.said@seattle.gov
- Phone:
- (206)760-4044
- Title:
- Capital Project Coordinator -Asst.
- Address:
- [object Object]
Addenda
Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.