City of Sugar Land, TX • TX • opengov
Distribution System Water Main Rehabilitation in Industrial Blvd and Hodges Bend Circle
View original posting
Submit your bid directly on the source platform.
Summary
Work for the Base Bid of the contract is for the construction of approximately 7,600 liner feet of water lines, services, fire hydrants, valves, fittings, connections and other appurtenances, as shown on the construction drawings, required by Project Manual and/or otherwise instructed by Engineer. The work also includes site and pavement restoration, tree removal and protection, storm water pollution prevention and traffic control in relation to the construction of the water lines.Work for the Alternate 1 Bid of the contract is for the construction of approximately 3,000 linear feet of water lines, service lines, fire hydrants, valves, fittings, connections, and other appurtenances, as shown on the construction drawings, required by Project Manual and/or otherwise instructed by Engineer. The work also includes site and pavement restoration, tree protection, storm water pollution prevention and traffic control in relation to the construction of the water lines.Work for the Alternate 2 Bid of the contract is for the construction of approximately 1,500 linear feet of water lines, service lines, fire hydrants, valves, fittings, connections, and other appurtenances, as shown on the construction drawings, required by Project Manual and/or otherwise instructed by Engineer. The work also includes site and pavement restoration, tree protection, storm water pollution prevention and traffic control in relation to the construction of the water lines.Please review the attached Invitation to Bid project manual and construction drawings.
Full description
The City’s Water Distribution System Rehabilitation Program is a waterline replacement program that prioritizes and replaces aging water main infrastructure that is prone to leakage and areas of high reported break history. The rehabilitation program helps to maintain and enhance customer service levels and provide adequate distribution capacity to customers.Currently, the waterline rehabilitation program includes alternating years of design and construction. The proposed replacement sections identified in the CIP CWA2401 project were selected by the Rehabilitation and Replacement Planning System (RRPS) model, which is a risk based Water Main Asset Management Model. The model uses a risk-based methodology, which includes water main age, breaks history, and the consequence of failure to prioritize the water main rehabilitation.
Attachments
Contact
- Email:
- pdelatorre@sugarlandtx.gov
- Phone:
- (281)225-2275
- Title:
- Project Manager II
- Address:
- [object Object]
Addenda
Addenda tracking is being rolled out. You will receive updates as soon as changes are detected.